New Tests of CYBERNETIC PANDEMIC (predicted by Schwab-Gates WEF as Covid). Electric and Internet Blackout in EU Countries

by Gospa News Editorial Staff
«A major power outage has hit Spain and Portugal, leaving millions of people without electricity. According to agencies, the electricity supply in the Iberian country was interrupted around 12:50 for unknown reasons. All Internet connection services have been interrupted. According to El Pais, in Madrid, the subway service is interrupted, and there are also disruptions at Barajas airport. At the moment, the Madrid Cercanias network service is also out of service. At street level, traffic lights are not working, while supermarkets are no longer allowing customers in as a security measure».
This is what SkyTG24 wrote a few hours ago.
EU Cyber Agency: “Initial investigations show fault, not attack”
The Instituto Nacional de Ciberseguridad, the national institute for cyber security, is assessing the situation and had not ruled out a cyber attack, something also taken into consideration by the Portuguese Minister for Territorial Cohesion, Manuel Castro Almeida, who, speaking to RTP, the Portuguese state TV, said: “There is this possibility, but it has not been confirmed”.
Now, according to the European Union Agency for Cyber Security (ENISA), initial investigations into the cause of the outages suggest a technical fault rather than a cyber attack:
“For the moment the investigation seems to highlight a technical or cable problem,” a spokesperson for the agency said in an emailed statement to Bloomberg. “However – he added – ENISA is closely monitoring the situation and we are in contact with the competent authorities at national and EU level”
The Cyber Pandemic predicted by the World Economic Forum
But the international mainstream network did not say that these technological incidents have been widely announced as the risk of a cyber pandemic by the World Economic Forum as reported in Gospa News investigations.
Just as Bill Gates and a former deputy director of the CIA predicted a Coronavirus pandemic that was then promptly verified in a global conspiracy on SARS-Cov-2 from a laboratory designed by Gates himself and the Central Intelligence Agency.
Today an imminent danger is announced in globalization to terrorize the West and make it ready to accept as a MYSTERIOUS FATALITY the massive event…
«Following the general blackout that hit Spain, the country’s nuclear power plants (five with seven reactors in operation) have stopped producing electricity. El Pais reported, explaining that for security reasons the production and supply of electricity to the grid has been interrupted. According to sources from the National Security Council, in any case the internal systems of each plant must remain operational and the plants are using generators to power them» adds SkyTG24 reporting a further atomic danger that Gates has got his hands on.
Suspected Cyber Attack: Blackout also in Spain and Portugal
In Portugal, official sources told national media that the interruption affected the entire country. Citizens of Andorra and some areas of France bordering Spain also reported being affected by the blackout.
The electricity blackout in Spain is also having repercussions in some municipalities in the south of France, not far from the Spanish border, particularly in Occitania, especially in the area of Perpignan, the so-called French Catalonia. This was reported by the local newspaper l’Independant.
The Spanish National Cryptology Center – which is part of the intelligence – is investigating to verify whether the blackout that occurred in the entire electricity network of the peninsula starting from the early afternoon was due to a cyber attack.
Madrid: Stop Flights: Metro Evacuated. Army Intervention Requested
The massive blackout that has affected almost all of Spain has also created problems for Madrid airports and trains across much of the Iberian Peninsula, where rail traffic is blocked. The subway and many flights have been stopped. Spanish authorities have asked citizens to stay home. An investigation is underway to determine whether the blackout was caused by a cyberattack. Rete Elettrica, the Spanish national operator, has reported that power has begun to be restored in the north and south of the peninsula.
The president of the Community of Madrid, Isabel Di’az Ayuso, has asked Prime Minister Pedro Sanchez to activate emergency level 3. “We are asking the national government to activate plan 3 so that the army can maintain order if necessary,” El Pais reports
RELATED TOPICS